Customization: | Available |
---|---|
After-sales Service: | Overseas Service Center Available |
Warranty: | 1year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The XM200 is mainly used for maintenance renovation of large-scale asphalt concrete pavement, fine cutting of cement road surface and surface layer milling, cement stabilized soil layer renovation. XM200 is a high efficient economic type milling machine.
Item
|
Unit
|
XM200
|
|
Maximum milling width
|
mm
|
2000
|
|
Maximum milling depth
|
mm
|
320
|
|
Milling wheel
|
Tool spacing
|
mm
|
15
|
Number of tools
|
|
162
|
|
Milling wheel diameter (with tool)
|
mm
|
980
|
|
Milling wheel maximum inclination
|
°
|
5
|
|
Diesel engines
|
Cooling method
|
|
Water cooling
|
Model
|
|
DHP13
|
|
Number of cylinders
|
|
6
|
|
Rated power
|
kw
|
390
|
|
Engine speed
|
rpm
|
2100
|
|
Fuel consumption: full load
|
l/h
|
103
|
|
Speed/grade ability
|
Working speed
|
m/min
|
0-34
|
Walking speed
|
km/h
|
0-5
|
|
Theoretical Gradeability (Working Blocks)
|
%
|
60%
|
|
Ground clearance
|
|
320
|
|
Weight / load
|
Shipping weight
|
kg
|
30000
|
Working weight
|
kg
|
34000
|
|
Track device
|
Front track
|
mm
|
1720×300×620
|
Rear crawler
|
mm
|
1720×300×620
|
|
Box volume
|
Fuel tank
|
L
|
1400
|
Hydraulic tank
|
L
|
400
|
|
Water tank
|
L
|
3400
|
|
Electrical system
|
V
|
24
|
|
Conveyor belt device
|
Aggregate conveyor belt width
|
mm
|
800
|
Discharging conveyor width
|
mm
|
800
|
|
Conveyor belt conveying capacity
|
≤m3/h
|
330
|
|
Shipping dimensions
|
Machinery (length×width×height)
|
mm
|
7650×2580×3000
|
Belt conveyor (length × width × height)
|
mm
|
8060×1150×1500
|
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,
3: What about the delivery time?
A: 30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.