XCMG Official Manufacturer RP953 Asphalt Concrete Paver.
RP
953 multifunctional paver adopts multiple advanced technologies like micro-electronic control, ultrasonic sensor, automatic electronic leveling, single vibrator and gas heating, etc. The product has high performance/price ratio, and it is applicable to the asphalt concrete paving for municipal construction and highways of various grades.T
•Driving left and right independent drive, microcomputer control, paving speed using constant-speed automatic control technology.
The diesel-powered SC9DK220 diesel engine has a powerful power of 162kW.
Adopting three-in-one powerful composite radiator, four sets of independent hydraulic transmission system are used for conveying and feeding, and the material level adopts ultrasonic sensor control technology.
The dividing device can be moved up and down to apply different paving thickness, and the dispersing blade adopts high wear resistance.
High wear-resistant steel plate is used for the alloy material, the feed floor and the screed floor to effectively extend the service life of the machine.
The mechanically extended double-stunned helium-heated screed is rigid and has a high degree of compactness.
Central centralized lubrication system can automatically evenly lubricate bearings in high temperature parts.
Product Parameters
Item |
RP953 |
dimension |
6610×2600×3950mm |
Weight |
22-30t |
place of origin |
CHINA |
Driving speed |
0-3km/h |
Basic pave width |
2.5-10.5m |
Maximum pave width |
10.5m |
Maximum layer thickness |
400mm |
Maximum paving speed |
18m/min |
Hopper capacity |
15t |
Maximum laydown rate |
900t/h |
Rate power |
162/2000 kw/rpm |
Product Show
Company Profile
FAQ
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,
3: What about the delivery time?
A: 30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.